High-pressure pumping equipment prepared for field operations
S02 · Pumping Services

Pumping capacity for transfer, intervention and production support.

Specialist pumping services for flow stations, product transfer, reinjection, cleaning and high-pressure field requirements.

S02///01
Supanova capability

What we deliver in pumping services.

The final scope, equipment, procedures and acceptance requirements are defined for each project.

01Auxiliary pumping02Flow-station pumping support03Flow-station pump repair and maintenance04Product transfer services05High-pressure fluid pumping06High-pressure water retro-jetting07Crude reinjection08Production barge and FSO crude-transfer pumping09Storage-tank sludge cleaning10Pneumatic flushing
Delivery approach

A controlled route from requirement to closeout.

01Requirement review
02Technical planning
03Resource alignment
04Controlled execution
05Verification
06Reporting and closeout
Project alignment

People, equipment and controls matched to the scope.

  • Project-specific method statements and procedures
  • Competent technical and field personnel
  • Defined HSE, quality and reporting requirements
  • Documented verification and handover
Technicians working around a valve and pipeline manifold at a field site
Relevant project experience

Selected pumping services projects.

Examples are drawn from Supanova's published project and experience records.

View all projects
012026

8" x 3 KM Ubie - Ukpelede Pipeline

Renaissance Africa Energy Company Limited

Routine Pigging (Cleaning), Chemical Batching & Auxiliary Pumping
022023

Provision of Plant Piping Modification and Repair/ Hydrotesting Services for Area 3 at PHRC

Dorman Long Engineering Limited

Provision of Plant Piping Modification and Repair/ Hydrotesting Services for Area 3 at PHRC
032023

Auxiliary Pumping for Pigging/IP Project Location

SHELL/MJD Limited

Kolo Creek, Bayelsa
042021

Provision of Hydrotesting of 24''x55km Bonny PHRC Crude Pipeline Services

Pipeline Infrastructure Nigeria Limited (PINL)

Provision of Hydrotesting of 24''x55km Bonny PHRC Crude Pipeline Services
052021

Pre-commissioning of 30" x 6.07km Gas pipeline. EESP Pump House A from Escravos Terminal to Offshore tie in point Costain

Chevron Nigeria Limited (CNL)

Pre-commissioning of 30" x 6.07km Gas pipeline. EESP Pump House A from Escravos Terminal to Offshore tie in point Costain
062025

Industrial Borehole Drilling

Renaissance Africa Energy Company Limited

Drilling of Water Boreholes for Auxiliary Pumping
Start a technical conversation

Let’s discuss your next project.

Speak with our team about engineering, pipeline integrity, construction, commissioning or industrial technology requirements.