EXP · Projects & experience
Evidence across pipelines, facilities and industrial systems.
Explore project experience by year, service, sector and delivery status.
EXP///01
77 published experience records
| Year | Project | Client | Service | Sector | Status |
|---|---|---|---|---|---|
| 2026 | 8" x 3 KM Ubie - Ukpelede PipelineRoutine Pigging (Cleaning), Chemical Batching & Auxiliary Pumping | Renaissance Africa Energy Company Limited | Pipeline Integrity | Pipelines | Current |
| 2026 | 10" Egbema West Flow Station - Egbema ManifoldCleaning, Chemical Batching, Descaling and Intelligent Pigging | Renaissance Africa Energy Company Limited | Pipeline Integrity | Pipelines | Current |
| 2026 | 10" Kolo NAG Manifold - Gbaran CPFCleaning, Chemical Batching and Intelligent Pigging | Renaissance Africa Energy Company Limited | Pipeline Integrity | Pipelines | Current |
| 2026 | 12" Oguta Flow Station - Egbema ManifoldCleaning, Chemical Batching, Descaling and Intelligent Pigging | Renaissance Africa Energy Company Limited | Pipeline Integrity | Pipelines | Current |
| 2026 | 18" Gbaran Manifold - Kolo Creek ManifoldRoutine Pigging (Cleaning) & Chemical Batching | Renaissance Africa Energy Company Limited | Pipeline Integrity | Pipelines | Current |
| 2026 | 20" Kolo Creek Manifold - Rumuekpe (KCTL) PipelineRoutine Pigging (Cleaning) & Chemical Batching | Renaissance Africa Energy Company Limited | Pipeline Integrity | Pipelines | Current |
| 2026 | 36" Rumuekpe - Nkpokwu PipelineRoutine Pigging (Cleaning) & Chemical Batching | Renaissance Africa Energy Company Limited | Pipeline Integrity | Pipelines | Current |
| 2026 | 18 inches Gbaran-Kolo Creek MFD Export LineRoutine Pigging (Cleaning) & Chemical Batching | Renaissance Africa Energy Company Limited | Pipeline Integrity | Pipelines | Current |
| 2026 | 20 inches New KCTL Routine Pigging for the month of April 2025Routine Pigging (Cleaning) & Chemical Batching | Renaissance Africa Energy Company Limited | Pipeline Integrity | Pipelines | Current |
| 2026 | Bulkline PPG Risers UT InspectionUT Test | Renaissance Africa Energy Company Limited | Pipeline Integrity | Pipelines | Current |
| 2026 | 8" Adibawa to GB GLCP Coating Survey | Renaissance Africa Energy Company Limited | Pipeline Integrity | Pipelines | Current |
| 2026 | 18" Gbaran-Kolo Creek Export LineCP Coating Survey | Renaissance Africa Energy Company Limited | Pipeline Integrity | Pipelines | Current |
| 2026 | Gbaran Axis BulklinesCP Coating Survey | Renaissance Africa Energy Company Limited | Pipeline Integrity | Pipelines | Current |
| 2026 | Effluent Reinjection Rumuekpe ManifoldRe-injection of Effluent | Renaissance Africa Energy Company Limited | Pipeline Integrity | Pipelines | Current |
| 2026 | 16inches Egbema-Assa TLRoutine Pigging, Flushing and Continuity Test | Renaissance Africa Energy Company Limited | Pipeline Integrity | Pipelines | Current |
| 2026 | 20inches Rumuekpe-Nkpoku TLRoutine Pigging (Cleaning) & Chemical Batching | Renaissance Africa Energy Company Limited | Pipeline Integrity | Pipelines | Current |
| 2026 | 36inches Rumuekpe-Nkpoku TLRoutine Pigging (Cleaning) & Chemical Batching | Renaissance Africa Energy Company Limited | Pipeline Integrity | Pipelines | Current |
| 2026 | Valves Servicing and Gantry Inspection at Rumuekpe ManifoldValves Servicing and Gantry Inspection at Rumuekpe Manifold | Renaissance Africa Energy Company Limited | Pipeline Integrity | Pipelines | Current |
| 2026 | Valves Servicing and Gantry Inspection at Kolo NAG ManifoldValves Servicing and Gantry Inspection at Kolo NAG Manifold | Renaissance Africa Energy Company Limited | Pipeline Integrity | Pipelines | Current |
| 2026 | Valves Servicing and Gantry Inspection at Gbaran ManifoldValves Servicing and Gantry Inspection at Gbaran Manifold | Renaissance Africa Energy Company Limited | Pipeline Integrity | Pipelines | Current |
| 2026 | Valves Servicing and Gantry Inspection at Egbema West Flow Station ManifoldValves Servicing and Gantry Inspection at Egbema West Flow Station Manifold | Renaissance Africa Energy Company Limited | Pipeline Integrity | Pipelines | Current |
| 2026 | Yokri Northbank Roadside Manifold Bulk LinesCleaning, Chemical Batching, Descaling and Intelligent Pigging | Renaissance Africa Energy Company Limited | Pipeline Integrity | Pipelines | Current |
| 2026 | 28” Trans Forcados Crude Oil (TFP)Pipeline Pre-commissioning | Pipeline Infrastructure Nigeria Limited (PINL) | Pipeline Integrity | Pipelines | Current |
| 2026 | 24" x 65km Escravos - Warri Refinery PipelinePipeline De-oiling & Flushing | Delta Pacific Maritime Services Limited (DPMSL) | Pipeline Integrity | Pipelines | Current |
| 2026 | 24" x 60km Bonny - Port Harcourt Refinery PipelinePipeline De-oiling & Flushing | Delta Pacific Maritime Services Limited (DPMSL) | Pipeline Integrity | Pipelines | Current |
| 2026 | 40" x 50km AKK PipelinePipeline Pre-commissioning | OILSERV Limited | Pipeline Integrity | Gas Infrastructure | Current |
| 2026 | Provision of Nitrogen Purging ServicesProvision of Nitrogen Purging Services | OILSERV Limited | Pipeline Integrity | Pipelines | Current |
| 2026 | Maintenance and Operation of SPMMaintenance and Operation of SPM | Orwell/Sahara | Electrical & Instrumentation | Oil & Gas | Current |
| 2025 | Installation and Refurbishment of Pipeline MarkersInstallation and Refurbishment of Pipeline Markers | Axxela CHGC | Construction | Pipelines | Completed |
| 2025 | Installation and Refurbishment of Pipeline MarkersInstallation and Refurbishment of Pipeline Markers | Axxela TGNL | Construction | Pipelines | Completed |
| 2025 | Industrial Borehole DrillingDrilling of Water Boreholes for Auxiliary Pumping | Renaissance Africa Energy Company Limited | Pipeline Integrity | Pipelines | Completed |
| 2025 | AKK Project of 40 inches of different sections of 150km Pipeline Pre-CommissioningAKK Project of 40 inches of different sections of 150km Pipeline Pre-Commissioning | Sicilsado Contracting Nigeria Limited | Pipeline Integrity | Gas Infrastructure | Completed |
| 2025 | Provision of Integrated Pipeline Pigging Services, Corrosion Control And MonitoringProvision of Integrated Pipeline Pigging Services, Corrosion Control And Monitoring | Renaissance Africa Energy Company Limited | Pipeline Integrity | Pipelines | Completed |
| 2025 | Cleaning and Intelligent Pigging of 10 inches by 15km Kolo Creek Nag Gbaram FlowstationCleaning and Intelligent Pigging of 10 inches by 15km Kolo Creek Nag Gbaram Flowstation | Renaissance Africa Energy Company Limited | Pipeline Integrity | Pipelines | Completed |
| 2025 | AKK Project of 40 inches by 34km Pipeline Pre-CommissioningAKK Project of 40 inches by 34km Pipeline Pre-Commissioning | OILSERV Limited | Pipeline Integrity | Gas Infrastructure | Completed |
| 2025 | Flushing of 24 inches by 60km Escravos WarriFlushing of 24 inches by 60km Escravos Warri | Delta Pacific | Pipeline Integrity | Pipelines | Completed |
| 2025 | Front End Engineering Design, Detailed Engineering Design of Gas Compressor complete with PLC control systemsFront End Engineering Design, Detailed Engineering Design of Gas Compressor complete with PLC control systems | Monipulo Petroleum Ltd | Engineering | Processing | Completed |
| 2024 | Steel Structures & Shelters Painting Intervention Work for the Rehabilitation of Area 5 of PHRCSteel Structures & Shelters Painting Intervention Work for the Rehabilitation of Area 5 of PHRC | PHRC/NNPC | Construction | Refining | Completed |
| 2024 | Acid & Caustic Skid RehabilitationAcid & Caustic Skid Rehabilitation | WRPC/NNPC | Construction | Refining | Completed |
| 2023 | Tank Cleaning ActivitiesTank Cleaning Activities | KRPC/NNPC | Construction | Refining | Completed |
| 2023 | Mechanical Works of Area 3 at PHRC RefineryMechanical Works of Area 3 at PHRC Refinery | Offshore Infrastructure Nigeria Limited/PHRC/NNPC | Construction | Refining | Completed |
| 2023 | Port Harcourt Refinery Flares Stack Refurbishment - Area 1 and Area 5 Rehabilitation of Port Harcourt Refinery Project LocationPort Harcourt Refinery | Dorman Long Engineering Limited | Construction | Refining | Completed |
| 2023 | Engineering, Procurement, Installation, Commissioning of Fifteen (15 nos) ION exchange Drums & Piping in Demineralized Water Treatment Plant Refurbishment ProjectEngineering, Procurement, Installation, Commissioning of Fifteen (15 nos) ION exchange Drums & Piping in Demineralized Water Treatment Plant Refurbishment Project | Warri Refining and Petrochemicals Company Limited | Construction | Industrial | Completed |
| 2023 | Mechanical Works of Area 3 at PHRC - Including Excavation, Backfilling, Pipe Dismantling, Welding, Piping Installation, for Firewater Piping NetworksMechanical Works of Area 3 at PHRC - Including Excavation, Backfilling, Pipe Dismantling, Welding, Piping Installation, for Firewater Piping Networks | Offshore Infrastructures Nigeria Limited (OINL) | Construction | Refining | Completed |
| 2023 | TFP 28" x 1.2Km Weak sectional Replacement ProjectTFP 28" x 1.2Km Weak sectional Replacement Project | Pipeline Infrastructure Nigeria Limited (PINL) | Construction | Pipelines | Completed |
| 2023 | Provision of Plant Piping Modification and Repair/ Hydrotesting Services for Area 3 at PHRCProvision of Plant Piping Modification and Repair/ Hydrotesting Services for Area 3 at PHRC | Dorman Long Engineering Limited | Construction | Refining | Completed |
| 2023 | Pre-Commissioning of 28 inches Pipeline SegmentsPre-Commissioning of 28 inches Pipeline Segments | Pipeline Infrastructure Nigeria Limited (PINL) | Pipeline Integrity | Pipelines | Completed |
| 2023 | Auxiliary Pumping for Pigging/IP Project LocationKolo Creek, Bayelsa | SHELL/MJD Limited | Pipeline Integrity | Pipelines | Completed |
| 2023 | White Product Line Flushing ProjectWhite Product Line Flushing Project | Port Harcourt Refinery Company (PHRC) | Pipeline Integrity | Pipelines | Completed |
| 2023 | Proven Run, Drying and Nitrogen Purging of The Expansion of Escravos Lagos pipeline System Phase II Project (36"x97 km pipeline, PS 1-4)Proven Run, Drying and Nitrogen Purging of The Expansion of Escravos Lagos pipeline System Phase II Project (36"x97 km pipeline, PS 1-4) | Nigeria Gas Company | Pipeline Integrity | Pipelines | Completed |
| 2023 | Orwell Offshore Electrical ScopeOrwell Offshore Electrical Scope | Orwell/Sahara | Electrical & Instrumentation | Oil & Gas | Completed |
| 2023 | Engineering, Procurement, Installation, Commissioning of Fifteen (15 nos) ION exchange Drums & Piping in Demineralized Water Treatment Plant Refurbishment ProjectEngineering, Procurement, Installation, Commissioning of Fifteen (15 nos) ION exchange Drums & Piping in Demineralized Water Treatment Plant Refurbishment Project | Warri Refining and Petrochemicals Company Limited | Electrical & Instrumentation | Oil & Gas | Completed |
| 2022 | Lube Oil Flushing & Analysis of Meren WIP Turbine Generators LineLube Oil Flushing & Analysis of Meren WIP Turbine Generators Line | Chevron Nigeria Limited (CNL) | Pipeline Integrity | Pipelines | Completed |
| 2022 | Port Harcourt Refinery Flares Stack Refurbishment - Rehabilitation of Port Harcourt Refinery ProjectPort Harcourt Refinery Flares Stack Refurbishment - Rehabilitation of Port Harcourt Refinery Project | Dorman Long Engineering Limited | Electrical & Instrumentation | Oil & Gas | Completed |
| 2022 | Pre-commissioning & Commissioning of Chevron 2 SPM Buoys (SPM 4 and 5)Pre-commissioning & Commissioning of Chevron 2 SPM Buoys (SPM 4 and 5) | Chevron | Electrical & Instrumentation | Oil & Gas | Completed |
| 2022 | ICSS Installation And CommissionICSS Installation And Commission | First Exploration & Petroleum Development Company Limited (First E&P) | Electrical & Instrumentation | Oil & Gas | Completed |
| 2021 | CHGC Gas Pipeline Modification ProjectCHGC Gas Pipeline Modification Project | Axxela Group | Construction | Pipelines | Completed |
| 2021 | Provision of Hydrotesting of 24''x55km Bonny PHRC Crude Pipeline ServicesProvision of Hydrotesting of 24''x55km Bonny PHRC Crude Pipeline Services | Pipeline Infrastructure Nigeria Limited (PINL) | Pipeline Integrity | Pipelines | Completed |
| 2021 | Pre-commissioning of 30" x 6.07km Gas pipeline. EESP Pump House A from Escravos Terminal to Offshore tie in point CostainPre-commissioning of 30" x 6.07km Gas pipeline. EESP Pump House A from Escravos Terminal to Offshore tie in point Costain | Chevron Nigeria Limited (CNL) | Pipeline Integrity | Gas Infrastructure | Completed |
| 2021 | Pre-commissioning & Commissioning of Chevron LocationFenog Yard, Warri & Chevron Escravos Offshore | Chevron Nigeria Limited (CNL) | Pipeline Integrity | Offshore | Completed |
| 2021 | Okwori Subsea Control System Upgrade ProjectOkwori Subsea Control System Upgrade Project | Addax Petroleum Development Nigeria Ltd | Electrical & Instrumentation | Oil & Gas | Completed |
| 2021 | OML 146 Metering Station Upgrade; E&I Installation and CommissioningOML 146 Metering Station Upgrade; E&I Installation and Commissioning | Enageed Resource Limited | Electrical & Instrumentation | Oil & Gas | Completed |
| 2020 | Engineering Design, Fabrication & Testing of Pig Launchers/Receivers for Aquaterra Energy LimitedEngineering Design, Fabrication & Testing of Pig Launchers/Receivers for Aquaterra Energy Limited | Aquaterra Energy Limited | Construction | Industrial | Completed |
| 2020 | Engineering Design, Fabrication & Testing of ASME Coded Stamp Drain/Vent Drum Vessel for Aquaterra Energy LimitedEngineering Design, Fabrication & Testing of ASME Coded Stamp Drain/Vent Drum Vessel for Aquaterra Energy Limited | Aquaterra Energy Limited | Construction | Industrial | Completed |
| 2020 | Engineering Design, Fabrication & Commissioning of Temporary Refuge for Aquaterra Energy LimitedEngineering Design, Fabrication & Commissioning of Temporary Refuge for Aquaterra Energy Limited | Aquaterra Energy Limited | Construction | Industrial | Completed |
| 2020 | 36 inches by 55 Kilometre Dangote Fertiliser Line pre-commissioning and commissioning36 inches by 55 Kilometre Dangote Fertiliser Line pre-commissioning and commissioning | Dangote Fertiliser Limited/Nigeria Gas Company | Pipeline Integrity | Pipelines | Completed |
| 2020 | Pre-commissioning and Commissioning of Anyala Conductor Support Platform E&I/Proeon scope for OML 85Pre-commissioning and Commissioning of Anyala Conductor Support Platform E&I/Proeon scope for OML 85 | Proeon UK | Pipeline Integrity | Offshore | Completed |
| 2020 | Engineering, Procurement, Installation, Commissioning of Fifteen (15 nos) ION exchange Drums & Piping in Demineralized Water Treatment Plant Refurbishment Project, of WRPC LocationWarri Refinery | Warri Refining and Petrochemicals Company Limited | Engineering | Processing | Completed |
| 2020 | Engineering Design, Fabrication & Testing of Pig Launchers/Receivers for Aquaterra Energy LimitedEngineering Design, Fabrication & Testing of Pig Launchers/Receivers for Aquaterra Energy Limited | Aquaterra Energy Limited | Engineering | Engineering | Completed |
| 2020 | Engineering Design, Fabrication & Testing of ASME Coded Stamp Drain/Vent Drum Vessel for Aquaterra Energy LimitedEngineering Design, Fabrication & Testing of ASME Coded Stamp Drain/Vent Drum Vessel for Aquaterra Energy Limited | Aquaterra Energy Limited | Engineering | Processing | Completed |
| 2020 | OML-126 Okwori Human Machine Interface (HMI) & Hydraulic Power Units (HPU) Intervention Maintenance WorkOML-126 Okwori Human Machine Interface (HMI) & Hydraulic Power Units (HPU) Intervention Maintenance Work | Addax Petroleum Development Nigeria Limited | Electrical & Instrumentation | Oil & Gas | Completed |
| 2020 | Pre-commissioning and Commissioning of Anyala Conductor Support PlatformPre-commissioning and Commissioning of Anyala Conductor Support Platform | Proeon UK | Electrical & Instrumentation | Oil & Gas | Completed |
| 2018 | Engineering Design, Fabrication & Commissioning of Temporary Refuge for Aquaterra Energy LimitedEngineering Design, Fabrication & Commissioning of Temporary Refuge for Aquaterra Energy Limited | Aquaterra Energy Limited | Engineering | Engineering | Completed |
| 2018 | Engineering Design, Fabrication & Commissioning of Temporary Refuge for Aquaterra Energy LimitedEngineering Design, Fabrication & Commissioning of Temporary Refuge for Aquaterra Energy Limited | Aquaterra Energy Limited | Electrical & Instrumentation | Oil & Gas | Completed |
| 2014 | Front End Engineering Design, Detailed Engineering Design of Gas Compressor complete with PLC control systemsFront End Engineering Design, Detailed Engineering Design of Gas Compressor complete with PLC control systems | Monipulo Petroleum Ltd | Electrical & Instrumentation | Oil & Gas | Completed |
| 2013 | PLC I/O Cabinet Power Supply UpgradePLC I/O Cabinet Power Supply Upgrade | Monipulo Petroleum Ltd | Electrical & Instrumentation | Oil & Gas | Completed |
| 2013 | Agbani Barge HVAC Change-Out and Upgrade at Agbani Barge, OffshoreAgbani Barge HVAC Change-Out and Upgrade at Agbani Barge, Offshore | Monipulo Petroleum Ltd | Electrical & Instrumentation | Oil & Gas | Completed |