Welders completing a field girth weld on a large-diameter pipeline
S06 · Engineering, Procurement, Construction and Installation (EPC)

Integrated EPC delivery from definition through installation.

Engineering, global procurement, fabrication, construction and installation coordinated as one project-delivery capability.

S06///01
Supanova capability

What we deliver in engineering, procurement, construction and installation (epc).

The final scope, equipment, procedures and acceptance requirements are defined for each project.

01

Engineering

01Conceptual design and feasibility studies02Front-end engineering design (FEED)03Pipeline engineering04Pump engineering design to meet specific needs05Process and facilities engineering06Electrical engineering07Instrumentation engineering (control systems, field instruments and metering)08Civil engineering09Integrated field-development planning: feasibility, concept and pre-FEED10Construction and fabrication engineering11Engineering consultancy services12Late-life asset management: production enhancement, concept studies, and structural and marine assurance
02

Procurement

01Technical and engineering specifications02Item verification03Product sourcing through global suppliers and manufacturers04Expediting services05Inspection services06Consolidation, packing and shipping07Freight forwarding and customs-clearance services08Warehousing services in Europe, Asia and the Americas
03

Construction and Installation

01Advanced workshop and fabrication facilities02Pressure-vessel fabrication and installation03Fabrication and installation of piping and structures04Fabrication and installation of pig traps05Fabrication of pump skids06Pipeline construction07Structural-steel fabrication and installation08Facility upgrades, revamps and modifications09Facility decommissioning and abandonment10Offshore installation and hook-ups11Production decks and modules12Production-equipment skid packages13Blasting and painting14Construction crews and equipment supply15Equipment rental16Installation of motor control centres (MCCs)17Fabrication of storage tanks
Delivery approach

A controlled route from requirement to closeout.

01Requirement review
02Technical planning
03Resource alignment
04Controlled execution
05Verification
06Reporting and closeout
Project alignment

People, equipment and controls matched to the scope.

  • Project-specific method statements and procedures
  • Competent technical and field personnel
  • Defined HSE, quality and reporting requirements
  • Documented verification and handover
Fabricated process vessel prepared for installation
Start a technical conversation

Let’s discuss your next project.

Speak with our team about engineering, pipeline integrity, construction, commissioning or industrial technology requirements.