012024
Steel Structures & Shelters Painting Intervention Work for the Rehabilitation of Area 5 of PHRC
PHRC/NNPC
Steel Structures & Shelters Painting Intervention Work for the Rehabilitation of Area 5 of PHRC
Manufacturing support for pipeline-pigging accessories and seals.
The final scope, equipment, procedures and acceptance requirements are defined for each project.

Examples are drawn from Supanova's published project and experience records.
PHRC/NNPC
Steel Structures & Shelters Painting Intervention Work for the Rehabilitation of Area 5 of PHRCAquaterra Energy Limited
Engineering Design, Fabrication & Testing of Pig Launchers/Receivers for Aquaterra Energy LimitedAquaterra Energy Limited
Engineering Design, Fabrication & Testing of ASME Coded Stamp Drain/Vent Drum Vessel for Aquaterra Energy LimitedAquaterra Energy Limited
Engineering Design, Fabrication & Commissioning of Temporary Refuge for Aquaterra Energy LimitedAquaterra Energy Limited
Engineering Design, Fabrication & Commissioning of Temporary Refuge for Aquaterra Energy LimitedSpeak with our team about engineering, pipeline integrity, construction, commissioning or industrial technology requirements.