At SES we are constantly pushing the boundary with each new project, in order to add value to our clients. The projects we have undertaken continue to cut across a wide spectrum of sectors.
S/NO. |
CONTRACT DESCRIPTION |
39 |
Spares and overhaul of 2 CAT engines---OES. |
38 |
Replace cylinder liners, connecting rod bearings, piston rings, piston assembly, cylinder head assemblies for compressors--- OES |
37 |
Spare parts purchasing and 8000 hours maintenance overhaul of Akondo gas lift compressors --- ADDAX |
36 |
Overhaul (48 000 hours) Ariel JGE/4 F-24782-273-3063 compressor (Maintenance and replacement of compressor cylinders, valves, lubricants, etc.)---ADDAX |
35 |
Installation & Commissioning Of PAGA Control System PLC ,ANYALA WEST/FPSO |
34 |
OKI-OZIENGBE-OREDO Metering Station Upgrade |
33 |
Instrumentation & Electrical works on the SPM for the Escravos Export System Project (EESP-2020- CW1794619) |
32 |
Pre-commissioning/ Commissioning of 36”x 55KM Dangote Fertilizer Gas transportation |
31 |
Routine pigging of 12” x 23km Imo River 1 /Oghale trunk line |
30 |
Routine pigging of 12” x 4 km from Oghale to Ebubu Delivery line |
29 |
Routine pigging using Auxiliary Pumping of 24” x 52 km Oghale/Bonny TMP |
28 |
Routine pigging using Auxiliary Pumping of 8” x 9.8 km Isi-Mmiri /Imo gate delivery line |
27 |
Routine pigging of 12” x 23km Imo River 1 /Oghale trunk line |
26 |
Routine pigging of 8” x 3km Agbada 1 & 2 Delivery line |
25 |
Escravos Export System Project, Terminal Piping scope |
24 |
Engineering/Procurement/Construction of Drain Drum vessel |
23 |
Construction Of Temporary refuge |
22 |
Engineering/Procurement/Construction Of Pig launchers & Receivers |
21 |
24’’ Valve maintenance at NGC Flow station at Owasa |
20 |
Addax SCS Upgrade system |
19 |
Pre-commissioning/ Commissioning of 24”x 56KM Escravos Node-WGTP Gas Transportation Pipeline |
18 |
Pre-commissioning/ Commissioning of Expansion Of Escravos Lagos pipeline System Phase II Project (36”x97 km pipeline, PS 1-PS 2) |
16 |
Pre-commissioning/ Commissioning of 24”x 56KM Escravos Node-WGTP Gas Transportation Pipeline |
15 |
Front End Engineering Design, Detailed Engineering Design of Gas Compressor complete with PLC control systems. |
14
|
Pre-commissioning of 30” x 6.07km Gas pipeline. EESP Location: from Escravos Terminal to Offshore tie in point “Costain” |
13 |
Pipeline pigging, removal of condescend from a 18” x 5km Gas Pipeline. Location: from IPS Aloji Aba to Gas metering Station Aloji. |
12 |
Pre-commissioning of 12” x 8.5km Gas Pipeline.
Location: from AGI Trans-Amadi to BUA Factory opposite Spar PHC |
11 |
Pre-commissioning of 4” x 2km Flow line. Location: AGIP Kwale flow line Beniku. |
10 |
Pre-commissioning of 24” x 56km Gas Pipeline.
Location: from NGC base warri to Escravos Node. |
09 |
12” x 45km offshore export pipeline pigging & Hydrotest. Location: Agbani Abana East to KAD). Offshore. |
08 |
Pre-commissioning of different sizes of pipe spools for Egbema power plant metering station. Location: Egbema metering station. |
07 |
Pre-commissioning of 24” x 56 km gas pipeline Location: from NGC base warri. To Escravos Node
|
06 |
18” X 2.5KM pipeline cleaning and hydrotest Location: Soku Gas plant to Soku flow station. Swamp |
05 |
Agbani Barge HVAC Change-Out and Upgrade.
Location: Agbani Barge, Offshore |
04 |
6” X 8.5KM Ebendo Export line stuck pig removal, installation of pig Launcher and 6” full bore ball valve. Location: Kwale |
03 |
Pig Signal Indicator Services, maintenance and installation Location: Abana East/ Knock Adoon. Offshore |
02 |
Coarse Strainer Change Out & Installation |
01 |
Third Stage Separator change out / installation Location: Abana East/Knock Adoon |